Draw a Gantt chart

gantt() draws a table with a row per task: a lane per task in the order of the table, a bar from each task's start to its end, dependencies as arrows, progress as a fill, and milestones (a start equal to the end) as diamonds.

import numpy as np
from anytimeline import gantt

plan = {
    "task": ["Requirements", "Design", "Prototype", "Review", "Build backend",
             "Build frontend", "Write docs", "Test", "Release"],
    "start": np.array(["2026-09-01", "2026-09-08", "2026-09-15", "2026-09-29", "2026-09-30",
                       "2026-10-02", "2026-10-05", "2026-10-20", "2026-11-02"],
                      dtype="datetime64[D]"),
    "days": [7, 9, 14, 0, 18, 16, 20, 13, 0],
    "after": [None, "Requirements", "Design", "Prototype", "Review", "Review", "Design",
              "Build backend, Build frontend", "Test, Write docs"],
    "done": [1.0, 1.0, 1.0, 1.0, 0.6, 0.4, 0.3, 0.0, 0.0],
    "phase": ["plan", "plan", "plan", "plan", "build", "build", "build", "ship", "ship"],
}
chart = gantt(
    plan, end=None, duration="days", duration_unit="d",
    depends="after", progress="done", color="phase", text="{task}",
    palette={"plan": "#4c78a8", "build": "#f58518", "ship": "#54a24b"},
    title="Project plan", today="2026-10-12",
)
chart

The columns

Argument The column Default
task= the task's name: its lane, and how other tasks refer to it "task"
start= when it starts "start"
end= when it ends; or end=None with duration= "end"
duration=, duration_unit= how long it takes: durations, or numbers in "d", "h", "min", ... —
depends= the tasks it follows: a name, a list of names, or names separated by commas —
parent= the task it is part of (missing for a top task) —
progress= how far it is done, 0 to 1 —
color= a category to color it by (a phase, a team), or one color the theme's color

palette= given as a dict sets the colors and the order of the legend. text= writes in each bar where it fits (here the task's name again). today= draws a line labelled "today"; give it datetime.now() for a live plan.

Read it

  • Hover over a task for its start, end, duration and progress.
  • Arrows run from the end of a task to the start of each task that follows it; when the next task starts before this one ends, the arrow goes around.
  • Switch to Order in the toolbar: every start and end gets the same width, so short tasks and long waits take the same room and the sequence of steps stands out.

Sub-tasks

parent= names the task each task is part of: sub-tasks go under their task, which you can fold (click its name; double-click to zoom to it).

work = {
    "task": ["Backend", "API", "Database", "Frontend", "Pages", "Styles", "Release"],
    "part of": [None, "Backend", "Backend", None, "Frontend", "Frontend", None],
    "start": np.array(["2026-10-01", "2026-10-01", "2026-10-06", "2026-10-05", "2026-10-05",
                       "2026-10-12", "2026-10-23"], dtype="datetime64[D]"),
    "end": np.array(["2026-10-20", "2026-10-14", "2026-10-20", "2026-10-22", "2026-10-16",
                     "2026-10-22", "2026-10-23"], dtype="datetime64[D]"),
    "after": [None, None, None, None, None, None, "Backend, Frontend"],
}
chart = gantt(work, parent="part of", depends="after", color="#4c78a8", title="Work breakdown")
print(chart._embed_html())

More than gantt() gives

gantt() returns a Timeline, so everything else works on it:

chart.marker("2026-10-30", "code freeze", color="#d62728")  # more lines
chart.events(meetings, time="time", lane="task", symbol="x")  # events on the tasks' lanes
chart.selection  # selected tasks, as rows

For bars on lanes that are not tasks (machines, people, services), with several bars per lane, see schedules and spans.